Name:
Student Storage Expansion
FiscalYear:
2014
Audience:
Engineering and Computer Science, College of
Submitter:
Rambharose, Pooran
Budget Manager:
Asseff, Lynn G.
Project Manager:
Rambharose, Pooran B.
Dept. Chair:
Ilyas, Mohammad
Local IT:
N/A
Dean:
Ilyas, Mohammad
Facilities:
N/A
OIT:
Campbell, Glen R.
Year 1:
$ 45,000.00
Year 2:
$ 0.00
Year 3:
$ 0.00
Total:
$ 45,000.00
Our cloud
infrastructure in the College of Engineering and Computer Science is
composed of many levels like networking, servers, & storage to name a
few. Thanks to past tech fee and
engineering funds, we have been able to expand these resources in the past. We are however, at a point where our student
cloud storage will soon approach its capacity and technology limits. The existing storage is based on the older
spinning disks also known as hard disks.
In the past hard disks have been sufficient for the average work
load. On cloud based desktops our
students generate a lot of input/output (I/O) operations due to the demands of
classroom work loads. In order to
satisfy this high demand for storage (I/O) operations we would like to add high
speed flash based capacity to our system.
Flash based storage is a proven technology that can generate 10x times
the performance of hard disks. The
college has already made an investment into this type of storage and has
purchased the base hardware. If this
proposal is funded by the tech fee committee it will allow us to leverage the
college’s hardware and expand upon the resources with additional high speed
flash disks. It will also allow us to
deliver a rich and seamless desktop experience that can handle the
instructional workloads that are placed on our students.
Fiscal Year 1 | Fiscal Year 2 | Fiscal Year 3 | Total | |
---|---|---|---|---|
Hardware One-Time | $ 45,000.00 | $ 0.00 | $ 0.00 | $ 45,000.00 |
Hardware Recurring | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 |
Software One-time | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 |
Software Recurring | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 |
Personnel One-time | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 |
Personnel Recurring | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 |
Other One-time | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 |
Other Recurring | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 |
Totals | $ 45,000.00 | $ 0.00 | $ 0.00 | $ 45,000.00 |
Filename | Size | Description |
---|---|---|
HP-3PAR-Expansion-GDL-08122-00.pdf | 60,005b | HP 3PAR Expansion |