Proposal

Name:

New Computers For VA-53 & T-10

FiscalYear:

2023

Audience:

Arts & Letters, College of

Submitter:

Proulx-Wein, Emilie

Budget Manager:

Dimaggio, Kathleen M.

Project Manager:

Lautar, Rebecca R

Proposal Approvers

Dept. Chair:

Lautar, Rebecca R

Local IT:

Topple, Gregory L.

Dean:

Barrios, Barclay J.

Facilities:

N/A

OIT:

Bagdonas, Joseph A.

Proposal Funding

Year 1:

$ 14,780.95

Year 2:

$ 14,780.95

Year 3:

$ 0.00

Total:

$ 29,561.90

Proposal Funding versus Average

Questionnaire

Narrative
The Department of Visual Arts & Art History requests support for the purchase of new computers for classroom use in the VA (53) Studio Building and the T-10 Graduate Facility. Aside from other studio-specific computers, the units in the VA (53) Studio Building serve day-to-day instruction, and they are mounted on carts that can be moved about the flexible classroom spaces to fit relevant studio configurations. The carts themselves and their respective screens are already in place – what needs to be done is to replace the computers themselves, so that instruction can match current standards, and to replace some peripheral items that have worn out through use. The classroom studios are also used by student clubs (e.g., Painters’ Forum, Potters’ Guild, Printmaking Club) and for guest lecturers. Cost and use estimates are given in the Hardware Requirements section: it appears that approximately discrete 1405 student-uses (e.g., a student in the classroom for a full semester; certainly, many students would use more than one facility at a time) could be served at a cost of just over $13 per student-use. The units in the T-10 facility, which is far from other department areas, serve the graduate students in our MFA program that have studios in the building and graduate and advanced undergraduate classes that are held there. Currently, these visual arts students are using hand-me-down computers from earlier studio upgrades. The estimated regular use by at least 20 students would bring the annual cost per student in this facility to approximately $576.50. The overall cost for both facilities would be just over $21 per student.
Facilities
OIT – A&L College Computing has been consulted in surveying the facilities and assisted in the selection of the equipment.
Hardware Requirements
Hardware Requirements: This proposal includes an attachment with a room-by-room description of all the equipment and specs of AV equipment, cameras, control systems and screens. It also includes estimates on the use of each room by students based on Fall 2023 data.
Software Requirements
Not applicable
Personnel Costs
Not applicable
Other Costs
OIT – A&L College Computing will provide technical support upon completion of the project.
Timeline
Our goal to have the project complete by December 2024.
Sustainability
Not applicable
Resource Matching
Not applicable
Implementing Organization
TAGXXXXXX

Proposal Budget

Fiscal Year 1 Fiscal Year 2 Fiscal Year 3 Total
Hardware One-Time $ 14,780.95 $ 14,780.95 $ 0.00 $ 29,561.90
Hardware Recurring $ 0.00 $ 0.00 $ 0.00 $ 0.00
Software One-time $ 0.00 $ 0.00 $ 0.00 $ 0.00
Software Recurring $ 0.00 $ 0.00 $ 0.00 $ 0.00
Personnel One-time $ 0.00 $ 0.00 $ 0.00 $ 0.00
Personnel Recurring $ 0.00 $ 0.00 $ 0.00 $ 0.00
Other One-time $ 0.00 $ 0.00 $ 0.00 $ 0.00
Other Recurring $ 0.00 $ 0.00 $ 0.00 $ 0.00
Totals $ 14,780.95 $ 14,780.95 $ 0.00 $ 29,561.90

Supporting Documentation

Filename Size Description
Estimate_A_US_QUOTE_3000164468363.1.pdf 92,127b OptiPlex Micro (Plus 7010)
Estimate_B__Tech Fee 24-inch iMac quote.png 357,934b 24 inch iMac, 4 year Apple Care+ For Schools, USB-USB-C Adapter.
Estimtate_C_SiteSurvey_PartsList_BocaSO_Techfee_2023.pdf 443,743b Sennheiser Wireless Mics System
Hardware Requirements and Use Estimates.pdf 106,162b VA-53 & T-10 Hardware Requirements and Use Estimates